Commercial property
Accommodation to let
Airside Operations
Control of contractors
Procurement
Airlines & tour operators
One Stop Shop: Maintenance Services
One Stop Shop provide professional maintenance services. All services are carried out by fully competent on site staff who are already full Glasgow Airport pass holders with access to all areas, including airside. All tradespersons are all site familiar and have been inducted through the Glasgow Airport control of contractors process. Our team hold all the relevant experience, training and all the health and safety requirements in place to conduct work on the airport grounds. In addition and when required we have many subcontractors that work in the airport on a regular basis and are familiar with Glasgow Airport.
We cover a range of services, including:
- Electrical and Mechanical Maintenance & Testing
- Electrical Installation
- Civil Engineering works
- Joinery Services
- Painting
- Ground works
- Plumbing Service
- Fire Risk Assessments and Fire Extinguisher Supply/Servicing
If you have a One Stop Shop Enquiry, please email Onestopshop@glasgowairport.com
Advertising at the airport
Travel Trade
Cranes
Cranes and other tall construction equipment operating with 6km of the airport require a crane permit.
Cranes and other tall construction equipment can cause a serious hazard to flight safety, by impacting obstacle limitation or instrument flight procedure surfaces and/or affecting navigational aids and communication equipment. Our crane permit leads will assess your proposed construction operation to ensure this can be undertaken without impacting air safety.
Please click here to apply for a permit.
Charges for this service are detailed below:
Standard (> 40 working days) | £250 |
Ad-hoc (< 40 days, > 5 working days) | £300 |
Unforeseen (< 5 working days, > 48 hours) | £350 |
Urgent (< 48 hours) | £400 |
Amendment/Extension | £65 |
Initial IFP assessment | POA |
Detailed IFP assessment | POA |
We encourage you to apply as early as possible as detailed safety assessments, if required, may take longer to complete.
Additional technical assessments may be required which may incur additional charges.
A copy of your permit must remain with the crane for the duration of the operation and must be produced if requested by airport staff or the police. Under the Air Navigation Order it is an offence to act recklessly or negligently in a manner likely to endanger aircraft.
For any enquiries please contact GLAcranes@glasgowairport.com.